Can a used land rig in the United States or Canada be bought and moved to another country? Yes, and it happens routinely. The rig is rigged down, broken into loads that can travel by road, carried to a port, shipped, cleared at the other end and rigged up again. What makes the move hard is not any single step. It is the number of parties involved, and the contract wording that decides who pays for each leg and who carries the risk at each point.
This guide is written for buyers outside North America who are looking at a US or Canadian land rig. It explains how a rig is broken down, what the shipping-method terms mean, how Incoterms set the handover point, which documents travel with the cargo, and who usually handles each step. It does not give customs, tax, legal or export-control advice, and it gives no freight prices, duty rates or tariff classifications. Those come from your freight forwarder, your customs broker and your own counsel.
Please note: Oil Rigs Now does not provide financing, shipping or logistics; requests for those are passed to Total Drilling Supply.
Why US rigs are moving abroad now
Westwood Global Energy Group published a ten-year land rig outlook on November 3, 2026. It forecasts Middle East land rig demand rising about 60% from 2025 levels, to roughly 820 rigs by 2035, and Latin American demand rising about 54%, to around 260 rigs. In Argentina, Westwood expects Vaca Muerta demand to grow from 84 rigs in 2025 to 113 by 2035. Westwood also says operators are targeting deeper and more complex reservoirs, and that this is contributing to the redeployment of under-used US rigs to Argentina, Australia and the Middle East.
For a buyer, that has two practical consequences. Used North American rigs are a real source of supply for those markets, and the seller you are talking to may be fielding enquiries from more than one country. The commercial terms you agree, above all where the rig is handed over, matter as much as the headline price.
For the wider market picture, see Global Drilling Rig Market Trends: What Buyers and Sellers Need to Know.
Source: Westwood Global Energy Group, "Global land drilling rig market set to tighten as Middle East demand rises 60% by 2035," press release, November 3, 2026 (westwoodenergy.com). Figures are Westwood's forecasts, not Oil Rigs Now data.
A land rig doesn't ship as one piece
A land rig is a set of large components that are pinned, bolted and plumbed together on location. To move it, the crew rigs it down and splits it into loads that can travel by road. One Texas freight forwarder puts it plainly: a land rig "breaks down into dozens of loads: mast sections, substructures, engines, and the drill floor."
Typical load groups for a conventional land rig include:
- Mast or derrick sections, the crown and the traveling block
- Substructure boxes and the drill floor
- The drawworks skid
- Engines and generator sets, or the power house on an electric rig
- Mud pumps
- Mud tanks, pits and solids-control equipment
- The BOP stack, accumulator (closing unit) and choke manifold
- The rotary table or top drive
- Pipe racks, catwalk and the drill string
- Doghouse, parts house and, on some packages, camp units
A published example shows the scale. Green Worldwide describes moving drilling equipment from Texas to Ghana in two breakbulk shipments. The first left Houston and weighed about 96,000 lb (43,545 kg); it carried derrick sections, CAT engines, mud pits, a substructure and a kelly drive bushing. The second left Freeport and weighed about 80,000 lb (36,287 kg); it carried a complete Wilson 42B-500 rig unit. Because the components exceeded container dimensions, both moved as breakbulk cargo with heavy-lift handling. A larger drilling package is many times that size.
This matters before anyone talks about freight, because the freight quote is built from the load list. Ask the seller early for the rig-down equipment list, with approximate dimensions and weights for each piece where they have them. Without that list, any freight figure is a guess.
- Seller's yardRig-down and load-out. The load list is built here.Usually: Seller or its rig mover
- Road to the portOversize trucking and permits.Usually: Seller or buyer's side, per the Incoterm
- Port of loadingUS export filing, port handling and heavy lifts.Usually: Exporter, forwarder, lift contractor
- At seaBreakbulk, flat rack, RoRo or container.Usually: Carrier, booked by the forwarder
- Port of dischargeImport clearance, duties and heavy lifts.Usually: Buyer's customs broker, forwarder
- Destination siteInland delivery and rig-up.Usually: Buyer or its contractor
Sources: Texas International Freight, "Heavy equipment shipped overseas" (txintlfreight.com); Green Worldwide Shipping, case study, "Multi-origin breakbulk execution supported drilling equipment delivery to Ghana" (greenworldwide.com). Both accessed November 6, 2026.
Breakbulk, flat rack, RoRo or container: what the choice depends on
Forwarders use four broad ways to move rig components by sea. The terms appear in every freight quote, so it helps to know what each one means.
- Breakbulk. Each piece is lifted aboard on its own, by ship's cranes or shore cranes, and stowed in the hold or on deck. This is the usual route for oversize, heavy or awkwardly shaped items such as substructure boxes and mast sections.
- Flat rack. An open-sided, open-topped container platform. Cargo that is too wide or too tall for a closed box, but fits the rack's footprint, can travel on a container ship this way.
- RoRo (roll-on/roll-off). Wheeled or self-propelled units are driven or towed aboard. Carrier-mounted rigs, trucks and some trailer-mounted units can move this way, depending on the route and the vessel.
- Standard container. Closed 20-ft or 40-ft boxes for tools, spares, consumables, small components and paperwork.
A single rig package often uses more than one method. Which piece goes which way depends on its dimensions and weight, the vessels that serve the route, and port handling at both ends. One forwarder notes that a full rig package can also move on a chartered or multipurpose vessel, which keeps it on one sailing with one discharge and one customs entry. Whether that suits a given rig and route is for the forwarder to assess.
The method is the forwarder's decision and, for heavy lifts, the lift contractor's. Lifting, rigging and sea-fastening are engineered, safety-critical work, and this guide does not cover them. What a buyer can do is ask clear questions:
- Which pieces do you expect to ship breakbulk, on flat racks, RoRo or in containers, and why?
- Does the route have regular breakbulk or RoRo service, or does the package need a charter?
- What do you need from the seller to quote properly? Forwarders commonly ask for weights, dimensions, center-of-gravity information and lifting points or drawings for the heavy pieces.
- Who handles the heavy lifts at the load port and at the discharge port?
Incoterms for a rig deal: who pays, who carries the risk, and where
Incoterms are three-letter trade terms published by the International Chamber of Commerce (ICC). The current set is Incoterms 2020, with eleven rules. Each rule says where the seller hands over the goods, who pays for which leg, and the point at which the risk of loss or damage passes from seller to buyer. They are contract terms, not law. As one logistics provider puts it, the rules "are not laws enacted by governments, but rather, guidelines agreed to by parties to a contract." They also do not set the price, the payment terms or the moment title passes. Those belong in the sale contract.
Every Incoterm needs a named place. "FOB" on its own means little. "FOB [terminal], Port of Houston" or "EXW [yard address], Odessa, Texas" tells everyone exactly where the handover happens. A used rig may sit in a yard hundreds of miles from the nearest port, so the named place can change the delivered cost a great deal.
The eleven rules fall into two groups. Seven can be used for any mode of transport:
| Term | Name | Where risk passes to the buyer |
|---|---|---|
| EXW | Ex Works | When the goods are made available at the named place, usually the seller's yard, not loaded |
| FCA | Free Carrier | When the goods are handed to the buyer's carrier at the named place |
| CPT | Carriage Paid To | When the goods are handed to the first carrier; the seller pays carriage to the named destination |
| CIP | Carriage and Insurance Paid To | As CPT, and the seller also buys cargo insurance |
| DAP | Delivered at Place | When the goods are ready for unloading at the named destination |
| DPU | Delivered at Place Unloaded | When the goods are unloaded at the named destination |
| DDP | Delivered Duty Paid | At the named destination, cleared for import, with duties paid by the seller |
Four are written for sea and inland waterway transport only:
| Term | Name | Where risk passes to the buyer |
|---|---|---|
| FAS | Free Alongside Ship | When the goods are placed alongside the vessel at the named port of shipment |
| FOB | Free on Board | When the goods are on board the vessel at the named port of shipment |
| CFR | Cost and Freight | When the goods are on board at the port of shipment; the seller pays freight to the named destination port |
| CIF | Cost, Insurance and Freight | As CFR, and the seller also buys cargo insurance |
A few points come up often in used-rig deals:
- EXW from the yard is common. Many used rigs are sold where they stand. Under EXW the seller makes the rig available at its yard, and the buyer's side handles loading, inland transport, export formalities and everything after. A sale "EXW yard" does not by default include rig-down or loading, so ask whether either is in the price.
- The sea-only terms assume the cargo goes straight onto the ship. FAS, FOB, CFR and CIF describe a handover at the vessel. When the goods are handed to a carrier earlier, for example at a terminal or the seller's yard, the any-mode terms such as FCA are written for that. Check that the term in your contract describes what will actually happen.
- CIF and CIP carry different default insurance. Under Incoterms 2020, CIF keeps Institute Cargo Clauses (C) as the default level of cover, while CIP now requires a higher level of cover, compliant with Institute Cargo Clauses (A) or similar clauses. The parties can agree a higher level under CIF. On a rig, agree the level of cover in writing.
- Under the C-terms, cost and risk split. The seller pays freight to the destination, but risk passes to the buyer earlier, at shipment. That surprises many first-time buyers.
Which term to use is a commercial decision for you and the seller, with your counsel. This guide explains the terms and does not recommend one.
Sources: International Chamber of Commerce, Incoterms 2020 (iccwbo.org); AIT Worldwide Logistics, "Incoterms" (aitworldwide.com). Both accessed November 6, 2026. Incoterms® is a trademark of the ICC.
The paperwork that travels with the rig
A cross-border rig shipment usually involves the documents below. Exact requirements depend on the route, the destination and the contract, so treat this as a list of names to raise with your forwarder, not a complete checklist.
| Document | Usually from | What it is for |
|---|---|---|
| Commercial invoice | Seller | States the goods, the value and the terms of sale; customs at both ends rely on it |
| Packing list, by load | Seller or forwarder | Itemizes each load and piece with dimensions and weights; it should match the invoice and the load list |
| Bill of lading | Carrier, through the forwarder | Receipt for the cargo and evidence of the contract of carriage; usually needed to take delivery at destination |
| Bill of sale, title and lien release | Seller | Shows the seller can sell the rig free of liens |
| Electronic Export Information (EEI) | Exporter or its authorized agent | The US export filing, made in the Automated Export System (AES) |
| Certificate of origin | Seller or exporter | Required by some destinations |
| Pre-shipment inspection report | Inspection company | Required by some destinations, or by the buyer |
| Cargo insurance certificate | Whichever party buys insurance under the Incoterm | Shows cover for the voyage |
US export filing. Electronic Export Information is filed in the Automated Export System (AES), the US Census Bureau's system for collecting export information. The filing rules are in the Foreign Trade Regulations, 15 CFR Part 30. The exporter, or a forwarder acting for it, makes the filing. The regulations exempt some low-value shipments, generally where the goods under a single Schedule B or HTS classification code, shipped to one consignee on one conveyance, are worth $2,500 or less, but that exemption has exceptions (15 CFR 30.37). Whether a filing is required, and for which lines, is for the exporter and its forwarder to confirm.
Export controls. Some drilling and energy equipment needs export-control screening before it ships. Whether a license is needed depends on the item, the destination and the end user. That determination belongs to the exporter and its forwarder or counsel, and this guide gives no classification.
Destination import rules. Import duties, permits, temporary-import arrangements and inspection requirements vary by country. Talk to a customs broker at the destination early, before the price is agreed.
Sources: US Census Bureau, "Foreign Trade Regulations" and "Export Filing: AES" (census.gov); 15 CFR 30.37, "Exemptions from the requirements for the filing of EEI" (ecfr.gov). Both accessed November 6, 2026.
Who does what: seller, forwarder, customs broker, buyer
The split below is typical, but the Incoterm and the contract decide it in each deal.
| Task | Usually handled by | Note |
|---|---|---|
| Rig-down and load-out at the yard | Seller or its rig-moving contractor | Confirm whether it is in the price |
| Trucking and road permits to the port | Seller or buyer's side, depending on the Incoterm | Oversize loads need permits |
| Vessel booking and stowage plan | Freight forwarder | Breakbulk, flat rack, RoRo or container |
| Heavy lifts at each port | Lift contractor, arranged through the forwarder | Engineered, safety-critical work |
| US export filing (EEI in AES) | Exporter or its forwarder | Under the Foreign Trade Regulations |
| Export-control screening | Exporter, with its forwarder or counsel | No classification given here |
| Cargo insurance | Seller or buyer, depending on the Incoterm | Agree the level of cover |
| Import clearance and duties | Buyer's customs broker | The seller handles this only under DDP |
| Inland delivery and rig-up at destination | Buyer or its contractor | Plan it from the load list |
Oil Rigs Now's part is the listing and the introduction between buyer and seller. Oil Rigs Now does not provide financing, shipping or logistics; requests for those are passed to Total Drilling Supply.
Questions to ask before you agree a price
- What are the delivery terms, exactly? EXW yard, FCA, FOB port or another rule, with the named place written out in full.
- Is rig-down and loading included? If so, to what point: loaded on trucks at the yard, or delivered to the port?
- Can you send the full component list and an approximate piece count? Include dimensions and weights where they exist. The freight quote depends on it.
- Where does the rig physically sit today? Several listings, including some on Oil Rigs Now, do not state a current location. Ask for the yard address before you request a freight quote.
- Which documents can you supply? Title and lien release, bill of sale, manuals, certifications and maintenance records.
- Who arranges the pre-shipment inspection, and who pays for it? For the inspection itself, see Buying a Used Drilling Rig: A Practical Inspection and Due-Diligence Guide.
- Has the rig been stacked, and for how long? A stacked rig may need more preparation before it can move. See Abandoned and Stacked Oil Rigs for Sale.
To lay out the cost lines in one place (purchase, rig-down, inland freight, ocean freight, duties and rig-up) with your own figures, see the Equipment Auction Landed-Cost Builder and the Rig Acquisition Cost to First Day-Rate Planner on the field tools page.
Browse current listings: land drilling rigs and mobile and workover rigs, or send a request through the quote form.
Request a Quote